Here is a look-ahead at the construction work planned for the Public Safety Building, from January 23, 2023 to January 27, 2023

Project Overview:

Construction of a combined public safety building commenced in December 2020 on the site of the former Town Hall at 26 Bryant Street. The new building will house the staff and equipment of Fire, Police, and Dispatch departments. The new combined Public Safety Building will replace two older Town buildings: Police Station at 600 High Street (built in 1962) and the Fire Station at 436 Washington Street (built in 1952). The new building is scheduled to open in early 2023 with final completion later this year.

Update as of January 20, 2023: The anticipated move-in date is March 3, 2023 and the project remains on budget.

Additional updates and information will be shared when available on the project page (www.dedham-ma.gov/psb) and will be shared via email. Subscribe at www.dedham-ma.gov/subscribe and select “Public Safety Building” from the list of news topics.

A Live View of the Project

livestream video of the construction is available on the Project website! Tune in from anywhere to watch the continued progress on the Combined Public Safety Building. While there, check out the updated Before-and-After photos of the progress onsite.

What to expect January 23, 2023 (Monday) through January 27, 2023 (Friday):

- The project site remains closed to the public.

- Contractors will be onsite Saturday, January 21, 2023, from 8:00 AM to 4:00 PM.

- Plumbers will return to finish connecting the sandblaster to the compressor

- Electricians will be onsite this weekend and next week to rough-in connections for the overhead doors, dryers, and will be performing remaining punch list items throughout the building.

- The installation of the rubber flooring on stairwell #1 is nearing completion and will continue this week.

- Remaining window blinds will be installed throughout the building.

- Excavators will be onsite to dig a trench for the light pole base along the handicap accessible parking spaces.

- Site fencing will continue to be installed this week and contractors have finished installing the security cage for the mezzanine.

- The basement level locker rooms have been cleaned and are awaiting final punch list items.

- Expect periodic entrance and exit of large trucks at the project site entrance, located at the intersection of Washington Street and Bryant Street. Please expect minor traffic delays at this intersection.

- No additional traffic impacts or pedestrian impacts are anticipated during this week.

Public Viewing Area:

If you want to stop by to check out the progress, stand by the picnic table outside the north entrance to Town Hall. This spot provides a great view into the project site and is outside of the project boundaries. Worth a visit!

Construction Hours:

- Crews will be onsite:

Saturday, January 21, 2023 from 8:00 AM to 4:00 PM

Monday through Friday: 7:00 AM to 5:00 PM

Project Team Contact Information:

- Immediate issues or concerns, please contact the Town Manager’s Office at 781-751-9100.

- For general questions or concerns, please contact the project team at [email protected]

- For more information about the Public Safety Building Project, please visit the project website at www.dedham-ma.gov/psb

- Download our project team contact information flyer on the project website.